Print this page

News / Latest info

27.07.2009

Contract award: Cameron / BP Block 31 PSVM


2off Tree Installation Workover Control Systems

Category: General
Posted by: david

Hitec Products has received contract to supply 2off complete Tree Installation Workover Control Systems (TIWOCS). The contract was won in strong international competition.

The two TIWOCS containers will be used in the north eastern corner of Block 31 in Angola, on the Plutao, Saturno, Venus and Marte projects. These systems will be used to operate XT, LRP EDP valves, TRT, surface flow tree production wing valve and methanol injection valves during installation of subsea production wellheads (XT) and workover operations.


Previous page: Downloads
Next page: Sitemap